Wide gradation material is used as general fill.
Common Uses:
- Backfilling – Fills large excavations.
- Subgrade improvement – Stabilizes weak soils.
- Site grading – Builds elevation.
NOTE: Pickup trucks will only be loaded if paired with a trailer that is at least 12 feet in length and equipped with a minimum of two axles. The combined truck and trailer must be legally rated to carry the intended load. Fowler Construction staff reserve the right to refuse loading any truck and/or trailer deemed unsafe or not roadworthy.
Wide gradation material is used as general fill.
Common Uses:
- Backfilling – Fills large excavations.
- Subgrade improvement – Stabilizes weak soils.
- Site grading – Builds elevation.
NOTE: Pickup trucks will only be loaded if paired with a trailer that is at least 12 feet in length and equipped with a minimum of two axles. The combined truck and trailer must be legally rated to carry the intended load. Fowler Construction staff reserve the right to refuse loading any truck and/or trailer deemed unsafe or not roadworthy.